Deliverables

WP 1: Requirements and Specifications 

  1. Demonstrations specifications and requirements (Confidential) – Sep 2022
  2. Demonstration validation and feedback report (Link) – Dec 2025

WP 2: Design Methodology & Algorithms

  1. EDA concepts and functional principles ready (Confidential) – Sep 2022
  2. Proof-of-Principles and first versions of the EDA methods ready for tool validation on the demonstrator cases (Confidential) – Jun 2023
  3. Co-Design Methods & Prototypes ready and applied to the design cases (Confidential) – Dec 2024

WP 3: Chip/Package Co-Design and IP

  1. Report on concepts and architectures (Confidential) – Mar 2023
  2. Report on the designs of the IPs, ICs and packaged ICs (Confidential) – Jun 2024
  3. Report on the prototypes for the demonstrations (Confidential) – Mar 2025

WP 4: Test & Measurements

  1. Test & validation methods (Link) – Jun 2023
  2. Validation boards and test systems (Confidential) – Jun 2025
  3. Comparison of design and measurement results (Confidential) – Dec 2025

WP 5: Demonstration & Validation

  1. Demonstrator descriptions (Public – Pending approval) – Jun 2024
  2. Delivery of demonstration systems (Confidential) – Dec 2025
  3. Demonstration evaluation report (Confidential) – Dec 2025

WP6: Project Management, Dissemination & Exploitation

  1. Public project profile (Link) – Mar 2022
  2. Project status reviews (Confidential) – Dec 2022
  3. Final dissemination report (Confidential) – Dec 2025