WP 1: Requirements and Specifications
- Demonstrations specifications and requirements (Confidential) – Sep 2022
- Demonstration validation and feedback report (Link) – Dec 2025
WP 2: Design Methodology & Algorithms
- EDA concepts and functional principles ready (Confidential) – Sep 2022
- Proof-of-Principles and first versions of the EDA methods ready for tool validation on the demonstrator cases (Confidential) – Jun 2023
- Co-Design Methods & Prototypes ready and applied to the design cases (Confidential) – Dec 2024
WP 3: Chip/Package Co-Design and IP
- Report on concepts and architectures (Confidential) – Mar 2023
- Report on the designs of the IPs, ICs and packaged ICs (Confidential) – Jun 2024
- Report on the prototypes for the demonstrations (Confidential) – Mar 2025
WP 4: Test & Measurements
- Test & validation methods (Link) – Jun 2023
- Validation boards and test systems (Confidential) – Jun 2025
- Comparison of design and measurement results (Confidential) – Dec 2025
WP 5: Demonstration & Validation
- Demonstrator descriptions (Public – Pending approval) – Jun 2024
- Delivery of demonstration systems (Confidential) – Dec 2025
- Demonstration evaluation report (Confidential) – Dec 2025
WP6: Project Management, Dissemination & Exploitation
- Public project profile (Link) – Mar 2022
- Project status reviews (Confidential) – Dec 2022
- Final dissemination report (Confidential) – Dec 2025